Division of Surface Water PTI - Holding Tanks




Holding Tanks

picture of holding tankGeneral Information

Holding tanks for sewage are permissible when no sanitary sewers are readily available, when sanitary sewers are being proposed but will not be available for up to 12 months, or when an existing onsite wastewater treatment & dispersal system has failed and sewers are not available. Holding tanks for industrial wastewater are generally acceptable with proper permits and construction.

In addition to specific holding tank requirements listed here, applicant must provide all material included in How to Obtain a PTI.


Forms

Forms associated with sewage holding tank projects.
(Download the appropriate forms from the PTI Forms page).

  • Form A: Applicant information
  • Form B8: Holding Tanks
  • Antidegradation Addendum

Additional Holding Tank Information

A PTI for a holding tank must also include:

  • Audio/Visual High Water Alarm
  • Copy of contract between applicant and hauler
  • Copy of contract between hauler and POTW accepting the waste for sewage

For other related topics: OAC 3745-42

 

Ohio EPA logo

Contact the Division of Surface Water
Mailing Address: P.O. Box 1049, Columbus, OH 43216-1049
Street Address: 50 West Town Street, Suite 700 Columbus, OH 43215
Phone: (614) 644-2001 ~ Fax: 644-2745 ~ E-mail
Emergency Response Hotline (800) 282-9378